{"id":25172,"date":"2020-11-17T14:42:55","date_gmt":"2020-11-17T18:42:55","guid":{"rendered":"https:\/\/www.carilec.org\/?p=25172"},"modified":"2020-11-17T14:42:55","modified_gmt":"2020-11-17T18:42:55","slug":"fire-at-skelecs-power-plant-causes-island-wide-outage","status":"publish","type":"post","link":"https:\/\/carilec.org\/fire-at-skelecs-power-plant-causes-island-wide-outage\/","title":{"rendered":"Fire at SKELEC\u2019s Power Plant Causes Island Wide Outage"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-7600 size-full\" src=\"https:\/\/www.carilec.org\/wp-content\/uploads\/2019\/10\/skelec-logo.png\" alt=\"\" width=\"445\" height=\"209\" srcset=\"https:\/\/carilec.org\/wp-content\/uploads\/2019\/10\/skelec-logo.png 445w, https:\/\/carilec.org\/wp-content\/uploads\/2019\/10\/skelec-logo-600x281.png 600w, https:\/\/carilec.org\/wp-content\/uploads\/2019\/10\/skelec-logo-300x141.png 300w\" sizes=\"auto, (max-width: 445px) 100vw, 445px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div id=\"attachment_25174\" style=\"width: 810px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-25174\" class=\"wp-image-25174 size-full\" src=\"https:\/\/www.carilec.org\/wp-content\/uploads\/2020\/11\/island-wide-outage-3.jpg\" alt=\"\" width=\"800\" height=\"533\" srcset=\"https:\/\/carilec.org\/wp-content\/uploads\/2020\/11\/island-wide-outage-3.jpg 800w, https:\/\/carilec.org\/wp-content\/uploads\/2020\/11\/island-wide-outage-3-600x399.jpg 600w, https:\/\/carilec.org\/wp-content\/uploads\/2020\/11\/island-wide-outage-3-300x200.jpg 300w, https:\/\/carilec.org\/wp-content\/uploads\/2020\/11\/island-wide-outage-3-768x512.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-25174\" class=\"wp-caption-text\">14 November, 2020<\/p><\/div>\n<p>&nbsp;<\/p>\n<p><strong>Basseterre, St. Kitts (<\/strong><strong>November 14<sup>th<\/sup>,<\/strong><strong>\u00a02020)<\/strong>\u2014Residents of St. Kitts were without power at approximately 7:15 am on Thursday November 12 due to a localized fire at the\u00a0St. Kitts Electricity Company Ltd\u00a0SKELEC\u2019s Needsmust Power\u00a0Plant. The fire first sparked\u00a0in\u00a0the plant\u2019s main\u00a0control panel\u00a0and\u00a0resulted\u00a0in an island-wide\u00a0outage. A prompt response from the St. Kitts and Nevis Fire and Rescue Services saw the fire being out and an all-clear given by 8:30 am.<\/p>\n<p>A team of about 75 employees at the SKELEC including electricians,\u00a0engineers, cable\u00a0technicians, and maintenance\u00a0technicians\u00a0worked for well over 24 hours repairing and replacing the damaged cables and equipment in the Feeder Room. Working late into the night and early on Friday morning, crews were able to return supply to the Power Station at approximately 3:45 am. Restoration of power began at 5:25\u00a0am, when the first feeder SSMC was placed online, with others following shortly after. \u00a0Electricity supply returned to all feeders at 8:25am, by 1:15 pm power was returned to all customers.<\/p>\n<p>According to the SKELEC\u2019s General Manager Clement Jomo Williams the fire at the plant could have been catastrophic.<\/p>\n<p><img decoding=\"async\" src=\"http:\/\/www.skelec.kn\/wp-content\/uploads\/2020\/11\/island-wide-outage-1-300x200.jpg\" \/>\u00a0 \u00a0 \u00a0 <img decoding=\"async\" src=\"http:\/\/www.skelec.kn\/wp-content\/uploads\/2020\/11\/island-wide-outage-2-300x200.jpg\" \/>\u00a0 \u00a0 <img decoding=\"async\" src=\"http:\/\/www.skelec.kn\/wp-content\/uploads\/2020\/11\/island-wide-outage-5-300x200.jpg\" \/>\u00a0 \u00a0 \u00a0 <img decoding=\"async\" src=\"http:\/\/www.skelec.kn\/wp-content\/uploads\/2020\/11\/island-wide-outage-4-300x200.jpg\" \/><\/p>\n<p>\u201cWhile the exact cause of the fire at the power plant is not yet known, we are fortunate that there were no injuries at the plant,\u201d Williams said. \u201cThankfully, a prompt response by our operators minimized what could have otherwise been a catastrophic situation. From a company standpoint safety is our number one priority.\u201d<\/p>\n<p>Williams said that the restoration effort was not an easy task, but he is proud that his teams were able to do so safely and promptly.<\/p>\n<p>\u201cVery few persons would understand the significant amount of physical work required to restore power after an island wide outage caused by a fire, as such I must express gratitude to our crews who worked tirelessly through the night and for hours to restore power,\u201d Williams said.<\/p>\n<p>The company\u2019s next steps include an extended assessment of damage and continued repair and replacement of equipment at the powerplant.<\/p>\n<p>The St. Kitts Electricity Company Ltd. would like to thank the public for its understanding and support during this island-wide outage. For more SKELEC updates please visit our Facebook page: SKELEC- St. Kitts Electricity Company Ltd or log on to\u00a0<a href=\"https:\/\/www.skelec.kn\/\" target=\"_blank\" rel=\"noopener noreferrer\">www.skelec.kn<\/a>.<\/p>\n<div class=\"nav-previous\"><a href=\"http:\/\/www.skelec.kn\/island-wide-outage-experienced-on-nov-12th\/\" rel=\"prev\"><span class=\"meta-nav\">\u2190<\/span>ISLAND-WIDE OUTAGE EXPERIENCED ON NOV 12TH<\/a><\/div>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; &nbsp; &nbsp; &nbsp; Basseterre, St. Kitts (November 14th,\u00a02020)\u2014Residents of St. Kitts were without power at approximately 7:15 am on [&hellip;]<\/p>\n","protected":false},"author":165,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[3333,3335,3331,3332,3336,3334,3330,3337,3329],"class_list":["post-25172","post","type-post","status-publish","format-standard","hentry","category-news","tag-cabletechnicians","tag-damagedcables-equipment","tag-electricians","tag-engineers","tag-feederroom","tag-maintenancetechnicians","tag-poweroutage","tag-powerstation-restoration","tag-skelec"],"acf":[],"aioseo_notices":[],"featured_image":"https:\/\/carilec.org\/wp-includes\/images\/media\/default.svg","month_date":"Nov","day_date":"17","_links":{"self":[{"href":"https:\/\/carilec.org\/api\/wp\/v2\/posts\/25172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/carilec.org\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/carilec.org\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/carilec.org\/api\/wp\/v2\/users\/165"}],"replies":[{"embeddable":true,"href":"https:\/\/carilec.org\/api\/wp\/v2\/comments?post=25172"}],"version-history":[{"count":0,"href":"https:\/\/carilec.org\/api\/wp\/v2\/posts\/25172\/revisions"}],"wp:attachment":[{"href":"https:\/\/carilec.org\/api\/wp\/v2\/media?parent=25172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/carilec.org\/api\/wp\/v2\/categories?post=25172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/carilec.org\/api\/wp\/v2\/tags?post=25172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}