{"id":62867,"date":"2021-12-15T17:51:57","date_gmt":"2021-12-15T21:51:57","guid":{"rendered":"https:\/\/www.carilec.org\/?p=62867"},"modified":"2021-12-15T20:40:25","modified_gmt":"2021-12-16T00:40:25","slug":"62867-2","status":"publish","type":"post","link":"https:\/\/carilec.org\/62867-2\/","title":{"rendered":"MPC Energy Solutions and Leclanch\u00e9 form strategic collaboration for utility-scale energy storage solutions"},"content":{"rendered":"<p>Tue Dec 14<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-62869\" src=\"https:\/\/www.carilec.org\/wp-content\/uploads\/2021\/12\/Hold-Back-the-River-1-of-1-300x200.jpg\" alt=\"\" width=\"600\" height=\"400\" srcset=\"https:\/\/carilec.org\/wp-content\/uploads\/2021\/12\/Hold-Back-the-River-1-of-1-300x200.jpg 300w, https:\/\/carilec.org\/wp-content\/uploads\/2021\/12\/Hold-Back-the-River-1-of-1-1024x683.jpg 1024w, https:\/\/carilec.org\/wp-content\/uploads\/2021\/12\/Hold-Back-the-River-1-of-1-768x513.jpg 768w, https:\/\/carilec.org\/wp-content\/uploads\/2021\/12\/Hold-Back-the-River-1-of-1-1536x1025.jpg 1536w, https:\/\/carilec.org\/wp-content\/uploads\/2021\/12\/Hold-Back-the-River-1-of-1-2048x1367.jpg 2048w, https:\/\/carilec.org\/wp-content\/uploads\/2021\/12\/Hold-Back-the-River-1-of-1-600x400.jpg 600w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>&nbsp;<\/p>\n<ul>\n<li style=\"text-align: justify;\"><em>The partnership starts with MPCES\u2019s participation in Leclanch\u00e9\u2019 Green Power Plant in St. Kitts and Nevis in the Caribbean, a landmark solar PV and battery energy storage project<\/em><\/li>\n<li style=\"text-align: justify;\"><em>The Green Power Plant will provide one third of St. Kitts\u2019 baseload needs and reduce carbon emissions by more than 740,000 metric ton over its lifespan<\/em><\/li>\n<li style=\"text-align: justify;\"><em>The project is the Caribbean\u00b4s largest combined solar power and battery storage system and will integrate 35.7 MWp solar photovoltaic with 45MWh of battery energy storage system to deliver 18.2 MW baseload green power to St. Kitts<\/em><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><strong>\u00a0<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>YVERDON-LES-BAINS, Switzerland;\u00a0<\/strong><strong>AMSTERDAM\/OSLO, Norway \u2013 14<sup>th<\/sup>\u00a0December 2021<\/strong>\u00a0\u2013\u00a0<a href=\"http:\/\/www.mpc-energysolutions.com\/\">MPC Energy Solutions<\/a>\u00a0(MPCES) has partnered with\u00a0<a href=\"http:\/\/www.leclanche.com\/\">Leclanch\u00e9<\/a>, one of the world\u2019s leading energy storage companies, publicly listed in Switzerland (SIX: LECN), to build the previously announced 35.7 MWp solar photovoltaic (PV) and 18.2 MW battery energy storage system (BESS) project designed with Leclanch\u00e9 Energy Management Software (L-EMS) in St. Kitts\u2019 Basseterre Valley, next to the capital city of Basseterre.<\/p>\n<p style=\"text-align: justify;\">The project requires about US$ 74 million of investment and MPCES has acquired 40% ownership in the project\u2019s holding company, in which Leclanch\u00e9 owns 60%. MPCES will invest up to US$ 17million.<\/p>\n<p style=\"text-align: justify;\"><em>\u201cAt COP26 in Glasgow, St. Kitts and Nevis presented a remarkable plan to reduce CO<sub>2<\/sub>\u00a0emissions by 61 percent by switching to 100 percent renewable energy. We in MPC Energy Solutions are happy and proud to be part of this important initiative through the development of this significant PV and battery project near the country\u2019s capital. The project will cover one-third of St. Kitts baseload needs for the next 20-25 years while reducing the carbon dioxide emissions by more than 740,000 metric ton.\u201d\u00a0<\/em><strong>said<\/strong>\u00a0<strong>Martin Vogt, CEO at MPC Energy Solutions<em>.<\/em><\/strong><\/p>\n<p style=\"text-align: justify;\"><em>\u201cWith our ongoing mission to help the region\u2019s transition to cleaner energies, we seek to create strong partnerships that will reinforce our position as a leader in the<\/em>\u00a0<em>energy market of\u00a0<\/em><em>Latin America and the Caribbean.<\/em><em>\u00a0Its strong technological expertise makes Leclanch\u00e9 a valuable partner that will undoubtedly help us do just that.\u00a0<\/em><em>This\u00a0<\/em><em>landmark<\/em><em>\u00a0project marks our entry into utility-scale hybrid projects that combine energy generation and storage. St Kitts and Nevis is one of\u00a0<\/em><em>several other countries within the Caribbean region that are committed to<\/em>\u00a0<em>diversifying its generation base away from diesel-fueled thermal power, and promoting smarter, greener and more resilient approaches that improve energy generation,\u201d\u00a0<\/em><strong>added<\/strong>\u00a0<strong>Martin Vogt<\/strong><em>.<\/em><\/p>\n<p style=\"text-align: justify;\">Leclanch\u00e9 has a long and successful track record of concepting and building innovative utility-scale installations including several projects with S4 Energy in The Netherlands; the Cremzow, Germany system in collaboration with Enel Green Power Germany and ENERTRAG; SWB, Germany; Marengo, Chicago, United States and several Canadian projects.<\/p>\n<p style=\"text-align: justify;\">The St. Kitts project, which is being built under an Engineering, Procurement and Construction (EPC) contract by Leclanch\u00e9, has a 20-year USD-denominated Power Purchase Agreement (PPA) with the St. Kitts Electric Company (SKELEC), the only energy utility company on the island. The government of St. Kitts and Nevis leased the land in the Basseterre Valley to Leclanch\u00e9 under a 20-year agreement with the option of a five-year renewal. Groundbreaking of the project took place in December 2020.<\/p>\n<p style=\"text-align: justify;\"><strong>Anil Srivastava, CEO at Leclanch\u00e9<\/strong>,\u00a0<strong>said<\/strong><em>: \u201cWe are excited to partner with MPC Energy Solutions for this landmark project in the Caribbean. This solar PV and BESS project demonstrates the ability of renewable energies to provide baseload power and competitively replace greenhouse gas emitting diesel-fuel power. The project will create material savings for SKELEC with a strong positive impact on the environment, CO<sub>2<\/sub>\u00a0emissions and the local communities.<\/em><\/p>\n<p style=\"text-align: justify;\"><em>We thank the government of St. Kitts and Nevis and SKELEC for their trust. Leveraging the vast experience of our partner MPCES and teamwork with SKELEC, we shall accelerate the construction and commissioning of this industry reference project \u2013 the Caribbean regions\u2019 largest green power plant.\u201d<\/em><\/p>\n<p style=\"text-align: justify;\">The St. Kitts project has been communicated as part of MPCES\u2019s advanced project backlog.<\/p>\n<p style=\"text-align: justify;\"><em>\u201cThis represents another step forward for MPC Energy Solutions in becoming a leading independent power producer in Latin America and the Caribbean. This is a region with tremendous potential for renewable energy, and I am particularly happy to announce this first project utilizing hybrid technology. This will undoubtedly be a reference case for us and other renewable energy developers,\u201d\u00a0<\/em><strong>Martin Vogt said<em>.<\/em><\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>###<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>About MPC Energy Solutions<\/strong><\/p>\n<p style=\"text-align: justify;\">MPC Energy Solutions (\u201cMPCES\u201d) is a global provider of sustainable energy and primarily focuses on low-carbon energy infrastructure, including solar and wind assets, and other hybrid and energy efficiency solutions. The Company participates in the full project lifecycle of renewable solutions, from early-stage development through construction and operation. More details at\u00a0<a href=\"http:\/\/www.mpc-energysolutions.com\/\">www.mpc-energysolutions.com<\/a><\/p>\n<p style=\"text-align: justify;\"><strong>About Leclanch\u00e9<\/strong><\/p>\n<p style=\"text-align: justify;\">Headquartered in Switzerland, Leclanch\u00e9 SA is a leading provider of high-quality energy storage solutions designed to accelerate our progress towards a clean energy future. Leclanch\u00e9\u2019s history and heritage is rooted in over 100 years of battery and energy storage innovation and the Company is a trusted provider of energy storage solutions globally. This coupled with the Company\u2019s culture of German engineering and Swiss precision and quality, continues to make Leclanch\u00e9 the partner of choice for both disruptors, established companies and governments who are pioneering positive changes in how energy is produced, distributed and consumed around the world. The energy transition is being driven primarily by changes in the management of our electricity networks and the electrification of transport, and these two end markets form the backbone of our strategy and business model. Leclanch\u00e9 is at the heart of the convergence of the electrification of transport and the changes in the distribution network. Leclanch\u00e9 is the only listed pure play energy storage company in the world, organised along three business units: stationary storage solutions, e-Transport solutions and specialty batteries systems. Leclanch\u00e9 is listed on the Swiss Stock Exchange (SIX: LECN). For more information, please visit\u00a0<a href=\"http:\/\/www.leclanche.com\/\">www.leclanche.com<\/a>.<\/p>\n<p style=\"text-align: justify;\">SIX Swiss Exchange: ticker symbol LECN | ISIN CH 011 030 311 9<\/p>\n<p style=\"text-align: justify;\"><strong>Disclaimer<\/strong><\/p>\n<p style=\"text-align: justify;\">This press release contains certain forward-looking statements relating to Leclanch\u00e9\u2019s business, which can be identified by terminology such as \u201cstrategic\u201d, \u201cproposes\u201d, \u201cto introduce\u201d, \u201cwill\u201d, \u201cplanned\u201d, \u201cexpected\u201d, \u201ccommitment\u201d, \u201cexpects\u201d, \u201cset\u201d, \u201cpreparing\u201d, \u201cplans\u201d, \u201cestimates\u201d, \u201caims\u201d, \u201cwould\u201d, \u201cpotential\u201d, \u201cawaiting\u201d, \u201cestimated\u201d, \u201cproposal\u201d, or similar expressions, or by expressed or implied discussions regarding the ramp up of Leclanch\u00e9\u2019s production capacity, potential applications for existing products, or regarding potential future revenues from any such products, or potential future sales or earnings of Leclanch\u00e9 or any of its business units. You should not place undue reliance on these statements. Such forward-looking statements reflect the current views of Leclanch\u00e9 regarding future events, and involve known and unknown risks, uncertainties and other factors that may cause actual results to be materially different from any future results, performance or achievements expressed or implied by such statements. There can be no guarantee that Leclanch\u00e9\u2019s products will achieve any particular revenue levels. Nor can there be any guarantee that Leclanch\u00e9, or any of the business units, will achieve any particular financial results.<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: justify;\"><strong>Media contacts MPC Energy Solutions<\/strong><br \/>\n<u><br \/>\nMPC Energy Solutions N.V.<\/u><\/p>\n<p style=\"text-align: justify;\">Investor Relations &amp; Public Relations<\/p>\n<p style=\"text-align: justify;\">E-mail: info@mpc-energysolutions.com<\/p>\n<p style=\"text-align: justify;\"><strong><u>Norway<\/u><\/strong><\/p>\n<p style=\"text-align: justify;\">Jo Christian Lund-Steigedal<\/p>\n<p style=\"text-align: justify;\">Corporate Communications AS<\/p>\n<p style=\"text-align: justify;\">T: +47 415 08733<\/p>\n<p style=\"text-align: justify;\">E-mail:\u00a0<a href=\"mailto:jcs@corpcom.no\">jcs@corpcom.no<\/a><\/p>\n<p style=\"text-align: justify;\"><strong><u>Americas<\/u><\/strong><\/p>\n<p style=\"text-align: justify;\">Perry Goldman<\/p>\n<p style=\"text-align: justify;\">Montieth &amp; Company<\/p>\n<p style=\"text-align: justify;\">T: +1 (646) 8643568<\/p>\n<p style=\"text-align: justify;\">E-mail:\u00a0<a href=\"mailto:pgoldman@montiethco.com\">pgoldman@montiethco.com<\/a><\/p>\n<p style=\"text-align: justify;\"><strong><u>United Kingdom<\/u><\/strong><\/p>\n<p style=\"text-align: justify;\">Charles Font<\/p>\n<p style=\"text-align: justify;\">Montieth &amp; Company<\/p>\n<p style=\"text-align: justify;\">T: +44 020 38575478<\/p>\n<p style=\"text-align: justify;\">E-mail:\u00a0<a href=\"mailto:cfont@montiethco.com\">cfont@montiethco.com<\/a><\/p>\n<p style=\"text-align: justify;\"><strong>Contacts Leclanch\u00e9<\/strong><\/p>\n<p style=\"text-align: justify;\"><strong>Media Switzerland \/Europe:<\/strong><\/p>\n<p style=\"text-align: justify;\">Thierry Meyer<\/p>\n<p style=\"text-align: justify;\">T: +41 (0) 79\u00a0785 35 81<\/p>\n<p style=\"text-align: justify;\">E-mail: tme@dynamicsgroup.ch<\/p>\n<p style=\"text-align: justify;\"><strong>Media North America:<\/strong><\/p>\n<p style=\"text-align: justify;\">Henry Feintuch \/ Ashley Blas<\/p>\n<p style=\"text-align: justify;\">T: +1-646-753-5710 \/ +1-646-753-5713<\/p>\n<p style=\"text-align: justify;\">E-mail:\u00a0<a href=\"mailto:leclanche@feintuchpr.com\">leclanche@feintuchpr.com<\/a><\/p>\n<p style=\"text-align: justify;\"><strong>Media Germany:<\/strong><\/p>\n<p style=\"text-align: justify;\">Christoph Miller<\/p>\n<p style=\"text-align: justify;\">T: +49 (0) 711 947 670<\/p>\n<p style=\"text-align: justify;\">E-mail:\u00a0<a href=\"mailto:leclanche@sympra.de\">leclanche@sympra.de<\/a><\/p>\n<p style=\"text-align: justify;\"><strong>Investor Contacts:<\/strong><\/p>\n<p style=\"text-align: justify;\">Anil Srivastava \/ Hubert Angleys<\/p>\n<p style=\"text-align: justify;\">T: +41 (0) 24 424 65 00<\/p>\n<p style=\"text-align: justify;\">E-mail:\u00a0<a href=\"mailto:invest.leclanche@leclanche.com\">invest.leclanche@leclanche.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tue Dec 14 &nbsp; The partnership starts with MPCES\u2019s participation in Leclanch\u00e9\u2019 Green Power Plant in St. Kitts and Nevis [&hellip;]<\/p>\n","protected":false},"author":165,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16],"tags":[],"class_list":["post-62867","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"aioseo_notices":[],"featured_image":"https:\/\/carilec.org\/wp-includes\/images\/media\/default.svg","month_date":"Dec","day_date":"15","_links":{"self":[{"href":"https:\/\/carilec.org\/api\/wp\/v2\/posts\/62867","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/carilec.org\/api\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/carilec.org\/api\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/carilec.org\/api\/wp\/v2\/users\/165"}],"replies":[{"embeddable":true,"href":"https:\/\/carilec.org\/api\/wp\/v2\/comments?post=62867"}],"version-history":[{"count":0,"href":"https:\/\/carilec.org\/api\/wp\/v2\/posts\/62867\/revisions"}],"wp:attachment":[{"href":"https:\/\/carilec.org\/api\/wp\/v2\/media?parent=62867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/carilec.org\/api\/wp\/v2\/categories?post=62867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/carilec.org\/api\/wp\/v2\/tags?post=62867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}