Page 21 - CARILEC Electric Tariff Report - March 2022
P. 21
Table 8: * Additional information: Electricity Tariff Rates (Us Cents/kWh) for IPPs in Barbados
Electricity Tariff Rates (US cents/kWh) for IPPs in Barbados
Anaerobic
Capacity Solar Wind Hydro Biomass
digestion
0 - 10 kW 22.38 19.88 0.00 25.13 22.13
11 - 100 kW 21.38 19.13 0.00 25.13 22.13
101- 250 kW 20.88 19.13 0.00 25.13 22.13
251 - 500 kW 19.13 19.13 0.00 25.13 22.13
501 kW - 1 MW 18.13 19.13 0.00 25.13 22.13
1 - 5 MW 11.63 11.13 0.00 0.00 0.00
5 - 10 MW 10.86 10.13 0.00 0.00 0.00
Table 9: Type of Mechanism for small-scale (distributed) RE Generation in Place
Type of mechanism for Small Scale (Distributed) RE Capacity Threshold in kW
Generation in Place
Net Net
Utility None Other Residential Band Commercial Band
Metering Billing
ANGLEC √ No No No N/A N/A
APUA No No √ √ 5.00 5.00
AQUALECTRA No No √ No 10.00 100.00
BEL No No No No N/A N/A
BELCO No No √ No 500.00 500.00
BLPC No No √ No 10,000.00 20,000.00
BPL No No √ No 100.00 500.00
BVI EC No No √ No 50.00 500.00
19
CUC No √ √ No 10 or 250 10 or 250 19
DOMLEC No No No √ 150.00 150.00
FORTIS TCI No No √ No 10.00 500.00
GBPC √ No No No N/A N/A
GPL N/A N/A N/A
20
GRENLEC No No No √ 120% 60% 20
JPSCO No No √ No 10.00 100.00
LUCELEC No √ No No 5.00 25.00
NEVLEC √ No No No N/A N/A
NV EBS No No √ No N/A N/A
NV ELMAR No √ No No 9.6 kVA 100 kVA
STUCO No No No √ 13.30 13.30
T&TEC √ No No No - -
VINLEC No No √ No 5.00 50.00
VIWAPA No √ No No N/A N/A
19 Customer peak demand or 10kW net billing, 250kW net metering, whichever is smaller
20 Percentage of average annual consumption
15