Page 31 - CARILEC Electricity Tariff - December 2014
P. 31
Installed Capacity supplied to Description of
Rate
Name of Utility Name of IPP Fuel Type Capacity the Grid under PPA PPA Payment
(US$/ kWh)
(MW) (MW) Structure
variable payment
($/KW-mth)
PPA under
Munro RE-Wind - 0.225 Munro
review
Energy
Jamaico
- - 0.5 Payment($/KW- Jamaico Ropecon
Ropecon
mth)
Energy
JPS Munro RE-Wind - 3 Payment($/KW- JPS Munro
mth)
Jamaica Energy Jamaica Broilers-
Broilers- HFO - - Payment($/KW-
COGEN
COGEN mth)
Fixed Payments
West Kingston ($/KW-mth), and West Kingston
HFO - 65.5
Power Partners variable payment Power Partners
($/KW-mth)
Energy
Wigton II RE-Wind - 18 Payment($/KW- Wigton II
mth)
LUCELEC - - - - - -
MUL - - - - - -
NVGEBE -- - - - - -
St. Christopher
SKELEC Air & Sea Ports Solar 0.75MW 0.75MW - -
Authority
PowerGen;
Trinity Power;
T&TEC & Trinidad Natural Gas 2,368 - - -
Generation
Unlimited
VIWAPA NRG Solar 5 4 - 0.1490
Notes:
BEL-Rate: Average rates for Oct – Dec.
BAPCOL: Rate inclusive of capacity and variable O&M payment.
BECOL) – Vaca: Rate inclusive of capacity payment - Rate inclusive of capacity payment.
BEL - BECOL PPA Payment Structure: Payment for capacity and associated energy : Base energy rate of US$0.0875/kWh with annual
escalation of 1.5% that started April 1, 2001 for annual energy up to 100GWh; US$0.050/kWh for annual energy in excess of
100GWh. O&M fee based on electricity revenues of utility.
Table 14: FINANCIAL INCENTIVES /MECHANISMS FOR SMALL-SCALE RENEWABLE ENERGY
UPTAKE
30
.