Page 38 - CARILEC CE Journal CEMAY2021
P. 38

APPENDIX 1:
                WÄRTSILÄ 32/34 PLATFORM ENGINE COMPARISON

































                            CI = Combustion Ignition; CI pilot = Combustion Ignition with pilot fuel; SI = Spark Ignition

               •  Estimated  uncontrolled  emission  figures  for
                 Wärtsilä 32/34 platform engines and corresponding       ABOUT  THE AUTHOR
                 AP-42  uncontrolled  emission  factors  for  Diesel
                 industrial  engines  and  4-stroke  lean-burn  gas
                  engines.                                                             Rodney P. George
                                                                                       is Vice President,
                                                                                       Caribbean
               •  All emission figures are given at 100% load, 20V                     (Energy Business)
                  cylinder configuration and 720 rpm at ISO 3046                       at Wärtsilä
                  ambient conditions with a generator efficiency of                    Caribbean
                  97.5%.                                                               Inc. and is
                                                                                       responsible for
               •  Electric power defined at generator terminals (own                   power plant sales
                 consumption for electric high pressure fuel pumps   and business development strategies for
                  for LG engine not deducted)                      the Caribbean area.  Mr. George's career
                                                                   has spanned engineering and managerial
                                                                   positions with the electric utility industry in
                                                                   the Caribbean and North America.  He joined
                                                                   Wartsila in 1989, serving in the capacities
                                                                   of Project Manager for power plant
                                                                   construction projects, and as Senior Business
                                                                   Development Manager related to power plant
                                                                   sales and marketing.  Mr. George holds a B.
                                                                   Sc Honours degree in Electrical Engineering
                                                                   from the University of the West Indies and
                                                                   an M.S in Management Engineering from the
                                                                   University of Bridgeport, Connecticut.



               38
   33   34   35   36   37   38   39   40   41   42   43