to  create  any  combination  of  feeders  with  the  required   hVpt SUbStAtIonS
        protection  and  control.  No  pre-build  for  the  future  is   To date, over 70 HVPT substations have been installed in
        needed, as it is only necessary to plan for what is needed   Manitoba, in a variety of areas including remote locations,
        that day. If additional load is required, another HV padmount   large  40,000+  housing  developments,  and  various
        transformer  can  be  installed  in  parallel  with  the  existing   manufacturing plants and mines. The stations, both concept
        one. In the larger stations, the steel work, the foundations,   and in-service, have been installed in as little as six months.
        and the yard of the  future  are  often  installed  at the time   If the HVPT substations used a transformer from stock, the
        of  the  initial  construction.  This  measure  incurs  additional   installation could be shortened to as little as a couple of
        expenses, along with the associated maintenance costs,   months.
        for an unknown future – in many cases never realized.
                                                                The  installations  have  saved  Manitoba  Hydro  millions  of
        6. Easy Installation and Minimal Maintenance – The HVPT   dollars. These savings are primarily due to reduced property
        fits onto a trailer and can be shipped completely assembled   costs; the reduction in the civil works of the station yard;
        to  your  site.  Installation  and  removal  is  easy  due  to  the   the elimination of the overhead structures, foundations, and
        design, which allows both HV and LV cable terminations   fence; and reduced transformer costs.
        to be left in place. The only maintenance required is the
        periodic cleaning of the HV compartment. There is no on-  Manitoba Hydro recognizes HVPT substations as the ideal
        load tap changer, regulators are used on the secondary,   substation design. The HVPT benefits make it ideally suited
        and there is no conservator tank, which eliminates most   for  the  southern  hemisphere,  with  interest  being  drawn
        commons sources for moisture or carbon contamination of   from Paraguay and Saudi Arabia. The HVPT works well with
        the oil. The HVPT substation does not require an outage for   renewable energy projects from 1 MVA to 15 MVA in size.
        ongoing maintenance, whereas a conventional substation   With the continued cost savings and increased efficiencies,
        can require 8-12 hours.                                 the HVPT substations will continue to be used.


        7. Run-to-end-of-life – The transformer is designed to be   AppLICAtIonS FoR thE CARIbbEAn
        easily  moved  on  or  off  the  foundation,  and  is  designed   Some  of  the  benefits  of  the  HVPT  substation  are  ideally
        to be in place until end-of-life with minimal maintenance.   suited for distribution systems in the Caribbean. Its small,
        Transformer  replacement  requires  approximately  eight   compact  size  can  withstand  natural  disasters  such  as
        hours.
                                                                hurricanes.  No  exposed  wire  eliminates  the  potential  for
                                                                copper theft and its small footprint allows for more efficient
        8.  A  Power  Transformer  in  a  Distribution  Mindset  –  The   installation locations.
        tank  and  internals  of  the  transformer,  including  the  core
        and  windings,  are  designed  to  the  same  standard  and   Gerald H. Geall and Lukas Douglas,
        specifications  as  power  transformers.  The  fact  that  they   Manitoba Hydro International Ltd
        were conceived with a distribution mindset results in lower
        cost  and  shorter  lead  times.  The  reduced  cost  allows
        Manitoba Hydro to afford a stock of a limited number of   AboUt mAnItobA hydRo IntERnAtIonAL Ltd. (mhI)
        these transformers, for emergency replacement and/or very   For 30 years, MHI has provided utility management, consulting,
                                                                and training services to over 75 countries around the world. As a
        short lead times.
                                                                wholly owned subsidiary of a renowned Canadian energy utility,
                                                                MHI assists clients to deliver electricity and natural gas efficiently,
                                                                effectively, and in a sustainable manner. Leveraging its international
                                                                experience and the parent utility’s methods and technologies, MHI
                                                                offers customized services, sustainable results, and true value to
                                                                clients.
                                                                From owner’s expert consulting to complete project management,
                                                                MHI  has  over  a  decade  of  experience  in  HVPT  substation
                                                                engineered design, procurement, and installation.

                                                                For  more  information  on  how  to  improve  substation  efficiency,
                                                                contact Lukas Douglas at [email protected].






         Single hV padmount transformer for Water treatment plant
        industry Journal 20